SBHS Block B
SBHS Block B Corridor

SBHS Seismic Strengthening Block B (Uttley)

Project – Seismic Strengthening Block B (Uttley)

Client – Southland Boys’ High School

Date - 2016

Project Management - Southern Quantity Surveyors

Principal Design Consultant – Beca Consulting

Main Contractor – Donaldson Construction

Value (approx.) - $0.55M

Project Description – Seismic Strengthening of Uttley block including bracing of roof structure and tying of brickwork façade.